Operation of Bintulu Centralised Sewerage Systems
Background
Sewerage systems have been developed and in operation progressively from the 1980’s under Bintulu Development Authority (BDA). Bintulu centralised s
In 2021, the government decided that BDA to hand over the sewerage services to Sewerage Services Department Sarawak for the future development and operation.
Existing Sewage Treatment Facilities
a) Centralised Sewage Treatment Plant
1. Tanjung Batu Centralised Sewage Treatment Plant (41,851 PE, 3902 properties)
b) Mechanised Package Plant
-
Taman Jasmine Aerated Tank
-
Ing Liing Residence
c) Imhoff Park
-
Berjaya Commercial Centre
-
RPR Sibiew
-
My Residence
-
Taman Jasa Putra Jaya
-
Taman Pelita
-
Techno Residence
-
Kidurong Sg Plan Central
-
Kidurong Gateway 1
-
Kidurong Gateway 2
d) Oxidation Ponds
-
Kemena Raya
-
Taman Beverly Hills
-
Taman Terus
-
Victory Ocean
-
Eastern Gateway Industrial
-
North South
-
Desa Damai
-
Taman Permaisuri
-
Sg Nyigu Industrial Estate
-
Kemena Industrial Estate
-
Taman Kemena Sutera I
-
Taman Kemena Sutera II
-
Taman Pearl 1
-
Taman Pearl 2
-
Taman Medan Ginseng
-
Sibiyu Jaya Industrial Estate
-
BBC Industrial Phase 2
-
Homelink Residence (101)
-
Golden Hill
-
Taman Seri Pelabuhan I
-
Taman Seri Pelabuhan 2
-
K3 Centralised
-
Sg Plan Centralised
-
Taman Saberkas Phase 1 Estate
-
Samalaju
Total Pump = 137 nos
Total Pump Stations = 83 nos
Total PE Served = 120, 466 PE
Total Sewer Length = 185, 190 m
Existing Sewer Network
Photo of North-South Oxidation Pond
Photo of Tanjung Batu Centralised Sewage Treatment Plant