Kapit Septic Sludge Treatment Plant

 

Kapit Septic Sludge Treatment Plant


ELEVENTH MALAYSIA PLAN PROJECTS

PROJECT

Project Title :
Kapit Septic Sludge Treatment Plant

Project Background :

All septic tanks need to be desludged regularly in order to maintain treatment efficiency. The current practice in Kapit town is to desludge the septic tank when it is full or blocked. There is also no proper septic sludge treatment facility. The sludge collected from septic tanks is currently being disposed in dump sites.  

The proposed septic sludge treatment plant is located on an 8-acre site about 4 km from Kapit Town center along Jalan Bukit Goram. It is about 1 km from the nearest residential area. 

The plant shall receive and treat septic sludge collected from the septic tanks within Kapit town and its outskirts. The treated sludge shall be disposed on site. This will enable the regular desludging of the septic tanks and package wastewater treatment units in Kapit. This will improve the efficiency of the wastewater treatment facilities in Kapit.

This treatment plant is designed to have an ultimate capacity of 100 m3/day.


Project Components :
  1. Operations Building,
  2. Sludge Reception and Holding Tank,
  3. Dewatering Building,
  4. Waste Water Treatment Unit,
  5. Polishing Ponds, and
  6. Landfill

Project Gallery
  Proposed Site for Kapit SSTP   Kapit SSTP Approved Site  
  Proposed Site for Kapit Septic Sludge Treatment Plant   Approved Site for Kapit Septic Sludge Treatment Plant  


Project Cost
RM15 Million


Design Stage
Consultants
No. Field of Consultancy Consultant's Name
1. Civil and Structural Konsortium Bumi Consults and Services Sdn. Bhd.
2. Mechanical and Electrical Perunding CHL Sdn. Bhd.
3. Land Surveyor Saland Survey Services
 
Design Period :  12 months
Schedule :  January 2017 to December 2017
Progress :  100%

Tendering Stage (Planned Period = 3 months)
Schedule : 2019

Construction Stage
Contractor :  To be appointed
Planned Period :  15 months
Schedule :  -