Kapit Septic Sludge Treatment Plant
ELEVENTH MALAYSIA PLAN PROJECTS |
PROJECT
Project Title :
Kapit Septic Sludge Treatment Plant
Project Background :
All septic tanks need to be desludged regularly in order to maintain treatment efficiency. The current practice in Kapit town is to desludge the septic tank when it is full or blocked. There is also no proper septic sludge treatment facility. The sludge collected from septic tanks is currently being disposed in dump sites.
The proposed septic sludge treatment plant is located on an 8-acre site about 4 km from Kapit Town center along Jalan Bukit Goram. It is about 1 km from the nearest residential area.
The plant shall receive and treat septic sludge collected from the septic tanks within Kapit town and its outskirts. The treated sludge shall be disposed on site. This will enable the regular desludging of the septic tanks and package wastewater treatment units in Kapit. This will improve the efficiency of the wastewater treatment facilities in Kapit.
This treatment plant is designed to have an ultimate capacity of 100 m3/day.
Project Components :
- Operations Building,
- Sludge Reception and Holding Tank,
- Dewatering Building,
- Waste Water Treatment Unit,
- Polishing Ponds, and
- Landfill
Project Gallery
Proposed Site for Kapit Septic Sludge Treatment Plant | Approved Site for Kapit Septic Sludge Treatment Plant |
Project Cost
RM15 Million
Design Stage
Consultants | ||
No. | Field of Consultancy | Consultant's Name |
1. | Civil and Structural | Konsortium Bumi Consults and Services Sdn. Bhd. |
2. | Mechanical and Electrical | Perunding CHL Sdn. Bhd. |
3. | Land Surveyor | Saland Survey Services |
Design Period | : | 12 months |
Schedule | : | January 2017 to December 2017 |
Progress | : | 100% |
Tendering Stage (Planned Period = 3 months)
Schedule | : | 2019 |
Construction Stage
Contractor | : | To be appointed |
Planned Period | : | 15 months |
Schedule | : | - |