AJAX Error
Sorry, failed to load required information. Please contact your system administrator.
Close
EN
BM
☰
X
HOME
ABOUT US
Chronology of Events
Corporate Philosophy
Powers & Functions
Client's Charter
Achievement of Client Charter
State Government Policy
Quality Initiatives
5S Corner
Key Focus Activity
Kumpulan Inovatif & Kreatif
Locate Us
MALAYSIA PLANS
RMK-9 Projects
Centralised Sewerage System for Kuching City
Sewage Treatment Plant at Boulder Built
Sibu Septic Sludge Treatment Plant
Miri Septic Sludge Treatment Plant
Sistem Saluran Pembetungan Najis Utama Bintulu
Miri City Wastewater Management System Master Plan Study
Sibu Town Wastewater Management System Master Plan Study
RMK-10 Projects
Centralised Wastewater Management System For Miri City (Phase 1)
RMK-11 Projects
Kuching Centralised Sewerage System Package 2
Kuching Centralised Sewerage System Zone 1 Package 2
Sri Aman-Betong Septic Sludge Treatment Plant
Sarikei-Bintangor Septic Sludge Treatment Plant
Kapit Septic Sludge Treatment Plant
Limbang Septic Sludge Treatment Plant
Samarahan Centralised Sewerage Master Plan Study
Sarikei-Bintangor Centralised Sewerage Master Plan Study
Mukah Centralised Sewerage Master Plan Study
Kuching Centralised Sewerage System Zone 1 Package 3
Review of the Kuching Centralised Sewerage System Master Plan Study
RMK-12 Projects
Centralised Wastewater Management System for Miri (Phase 2)
MANAGEMENT
Plants Operation
Kuching Centralised Sewage Treatment Plant
Taman Boulder Built, Kuching STP
BINTULU CENTRALISED SEWERAGE SYSTEMS
Sibu Septic Sludge Treatment Plant
Miri Septic Sludge Treatment Plant
Treatment Plant Tour
Media Centre
News
Press Releases
Video Gallery
Audio Gallery
Photo Gallery
Resource Centre
Laws & Regulations
Publications
Guidelines No. 1
Guidelines No. 2
Guidelines No. 3
Exhibition Panels
Department Leaflets
Projects Leaflet
Operations Leaflet
Organization Anti-Corruption Plan (OACP-JPPS) 2021-2025
Data & Statistics
Public Sewage Treatment Plant
Inventory of Wastewater Treatment Facility
Septic Sludge Collection
Online Services Statistics
Educational Visit Statistics
Tender & Quotation
Industrial Training
Industrial Training Programme:Degree
Industrial Training:General Description
Industrial Training Programme:Diploma
Download
Frequently Asked Questions
OUR ORGANISATION
Function Chart
Organisation Chart
Staff Directory
List of APC Recipient
List of Former Staff
Mukah Centralised Sewerage Master Plan Study
Mukah Centralised Sewerage Master Plan Study
ELEVENTH MALAYSIA PLAN PROJECTS
PROJECT
Project Title:
Mukah Centralised Sewerage System Master Plan Study
Project Background:
Mukah Town has a population of about 46,000. The town is situated on the flat coastline facing South China Sea. It does not have centralized sewerage system. The black water is treated by individual septic tanks. The grey water is discharged directly into the waterways. Due to the population increase, the drains in the built-up areas are seriously polluted.
The project is to carry out a study on the centralized sewerage system to formulate the long-term management and technical strategies to collect, transport, treat and dispose the sewage of the town.
The study shall formulate a master plan for centralized sewerage system that shall provide necessary framework guiding the future sewerage infrastructure development of the town and prioritizing the strategies for implementation.
Project Cost
RM921,064.34
Consultant
M/s Jurutera ADDA Sdn Bhd
Planned Period
8 months
Commencement Date
22 May 2017
Revised Completion Date
July 2019
Final Report Submission Date
Final Report submitted by Consultant on 19 July 2019