AJAX Error
Sorry, failed to load required information. Please contact your system administrator.
Close
EN
BM
☰
X
HOME
ABOUT US
Chronology of Events
Corporate Philosophy
Powers & Functions
Client's Charter
Achievement of Client Charter
State Government Policy
Quality Initiatives
5S Corner
Key Focus Activity
Kumpulan Inovatif & Kreatif
Locate Us
MALAYSIA PLANS
RMK-9 Projects
Centralised Sewerage System for Kuching City
Sewage Treatment Plant at Boulder Built
Sibu Septic Sludge Treatment Plant
Miri Septic Sludge Treatment Plant
Sistem Saluran Pembetungan Najis Utama Bintulu
Miri City Wastewater Management System Master Plan Study
Sibu Town Wastewater Management System Master Plan Study
RMK-10 Projects
Centralised Wastewater Management System For Miri City (Phase 1)
RMK-11 Projects
Kuching Centralised Sewerage System Package 2
Kuching Centralised Sewerage System Zone 1 Package 2
Sri Aman-Betong Septic Sludge Treatment Plant
Sarikei-Bintangor Septic Sludge Treatment Plant
Kapit Septic Sludge Treatment Plant
Limbang Septic Sludge Treatment Plant
Samarahan Centralised Sewerage Master Plan Study
Sarikei-Bintangor Centralised Sewerage Master Plan Study
Mukah Centralised Sewerage Master Plan Study
Kuching Centralised Sewerage System Zone 1 Package 3
Review of the Kuching Centralised Sewerage System Master Plan Study
RMK-12 Projects
Centralised Wastewater Management System for Miri (Phase 2)
MANAGEMENT
Plants Operation
Kuching Centralised Sewage Treatment Plant
Taman Boulder Built, Kuching STP
BINTULU CENTRALISED SEWERAGE SYSTEMS
Sibu Septic Sludge Treatment Plant
Miri Septic Sludge Treatment Plant
Treatment Plant Tour
Media Centre
News
Press Releases
Video Gallery
Audio Gallery
Photo Gallery
Resource Centre
Laws & Regulations
Publications
Guidelines No. 1
Guidelines No. 2
Guidelines No. 3
Exhibition Panels
Department Leaflets
Projects Leaflet
Operations Leaflet
Organization Anti-Corruption Plan (OACP-JPPS) 2021-2025
Data & Statistics
Public Sewage Treatment Plant
Inventory of Wastewater Treatment Facility
Septic Sludge Collection
Online Services Statistics
Educational Visit Statistics
Tender & Quotation
Industrial Training
Industrial Training Programme:Degree
Industrial Training:General Description
Industrial Training Programme:Diploma
Download
Frequently Asked Questions
OUR ORGANISATION
Function Chart
Organisation Chart
Staff Directory
List of APC Recipient
List of Former Staff
Limbang Septic Sludge Treatment Plant
Limbang Septic Sludge Treatment Plant
ELEVENTH MALAYSIA PLAN PROJECTS
PROJECT
Project Title :
Limbang Septic Sludge Treatment Plant
Project Background :
All septic tanks need to be desludged regularly in order to maintain treatment efficiency. The current practice in Limbang town is to desludge the septic tank when it is full or blocked. There is also no proper septic sludge treatment facility. The sludge collected from septic tanks is currently being disposed in dump sites.
The proposed septic sludge treatment plant is located on an 11-acre site about 10 km from Limbang Town center along Jalan Kubong. It is about 0.5 km from the nearest residential area.
The plant shall receive and treat septic sludge collected from the septic tanks within Limbang town and its outskirts. The treated sludge shall be disposed on site. This will enable the regular desludging of the septic tanks and package wastewater treatment units in Limbang. This will improve the efficiency of the wastewater treatment facilities in Limbang.
This treatment plant is designed to have an ultimate capacity of 100 m
3
/day.
Project Components :
Operations Building,
Sludge Reception and Holding Tank,
Dewatering Building,
Waste Water Treatment Unit,
Polishing Ponds, and
Landfill
Project Gallery
Satellite Map
Locality Map
Project Cost
RM15 Million
Design Stage
Consultants
No
.
Field of Consultancy
Consultant's Name
1.
Civil and Structural
Standard Engineers Sdn Bhd
2.
Mechanical and Electrical
Jurutera Azan Bersekutu Sdn Bhd
3.
Land Surveyor
Survey Development Services
Design Period
:
9 months
Schedule
:
September 2017 to May 2018
Progress
:
100%
Tendering Stage (Planned Period = 3 months)
Schedule
:
2019
Construction Stage
Contractor
:
To be appointed
Planned Period
:
15 months
Schedule
:
-
Useful Link