picture

Sarikei-Bintangor Centralised Sewerage Master Plan Study

 

Sarikei-Bintangor Centralised Sewerage Master Plan Study


ELEVENTH MALAYSIA PLAN PROJECTS

PROJECT Project Title:
Sarikei-Bintangor Centralised Sewerage System Master Plan Study

Project Background:
Sarikei-Bintangor Town has a population of about 89,000. The towns are situated on the flat Rajang River basin. They do not have centralized sewerage system. The black water is treated by individual septic tanks. The grey water is discharged directly into the waterways. Due to the population increase, the drains in the built-up areas are seriously polluted.

The project is to carry out a study on the centralized sewerage system to formulate the long-term management and technical strategies to collect, transport, treat and dispose the sewage of the town.

The study shall formulate a master plan for centralized sewerage system that shall provide necessary framework guiding the future sewerage infrastructure development of the town and prioritizing the strategies for implementation.
 
Project Cost RM913,439.42
 
Consultant M/s Jurutera Jasa (Sarawak) Sdn Bhd
 
Planned Period 8 months
 
Commencement Date 22 May 2017
 
Revised Completion Date July 2019
 
Final Report Submission Date Final Report submitted by Consultant on 23 August 2019