Sewer Plan Submission - New Application
| 1. | Design shall be in accordance with the requirements of the latest Sarawak Urban Sewerage Systems Guidelines. | ||
| a. | Design Report shall consist of design parameters, design standards and references. | ||
| b. | The Report shall document and tabulate step by step engineering calculations as in Hydraulic Design Form. (download Hydraulic Design Form at download page) |
||
| c. | For schemes to be developed in phases, the Consultant shall submit a master plan of the proposed sewerage system for the whole scheme together with the detailed network drawings for the phase/phases to be developed. | ||
| d. | The Qualified Person shall submit their application using Sewerage Plan Submission Form. (download Sewerage Plan Submission Form at download page) |
||
| e. | Authorization of Qualified Person (download Letter of Authorization at download page). | ||
| 2. |
Three (3) sets of drawings shall be submitted. The Authority shall return two (2) sets of the approved drawings to the Consultant. | ||
| 3. | One (1) compact disc (CD) containing the approved Sewer Plan in PDF Format shall be submitted to the Authority. | ||
