Kuching Centralized Wastewater Management System Package 2
16 Mar 2012
This method shall be used for sewer works exceeding 6 metres deep and in hard soil or rock.
16 Mar 2012
The construction method is similar to Slurry Method, the soil from the Tunnel Boring Machine (TBM) is removed by an auger train.
16 Mar 2012
This method shall be used mainly for Tertiary Sewer and Property Connections which are laid less than 2.5 metres underground.
16 Mar 2012
The Wastewater Treatment Plant is designed for 100,000 PE (Population Equivalent)
 