Samarahan Centralised Sewerage Master Plan StudySamarahan Centralised Sewerage Master Plan Study

ELEVENTH MALAYSIA PLAN PROJECTS

PROJECT Project Title:
Samarahan Centralised Sewerage System Master Plan Study

Project Background:
Samarahan Town has a population of about 103,000. The town is situated on the coastal area. It has no centralized sewerage system. The black water is treated by individual septic tanks. The grey water is discharged directly into the waterways. Due to the population increase, the drains in the built-up area are seriously polluted.

The project is to carry out a study on the centralized sewerage system to formulate the long-term management and technical strategies to collect, transport, treat and dispose the sewage of the town.

The study shall formulate a master plan for centralized sewerage system that shall provide the necessary framework guiding the future sewerage infrastructure development of the town and prioritizing the strategies for implementation.
Project Cost RM999,988.10

Consultant M/s Jurutera Minsar Consult Sdn Bhd

Planned Period 8 months

Commencement Date 22 May 2017

Revised Completion Date July 2019

Progress as at 30 June 2019 Draft Final Report submitted by Consultant