EN  | BM
Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Font: IncreaseFont: NormalFont: Decrease
Background: 1 Background: 2 Background: 3 

online visitor Online Visitors 15
total visitor Total Visitors 1,842,041
Last Update: 22 Jul 2019
Version 8.2.1
Operation of Taman Boulder BuiltOperation of Taman Boulder Built

Taman Boulder Built, Kuching Sewage Treatment Plant

CONSTRUCTION INFORMATIONS(See details)

SYSTEM COVERAGETaman Boulder Built housing area with 191 units of houses.
TREATMENT METHOD

 

TYPE OF CONSTRUCTED WETLAND PLANTS


 

EFFLUENT STANDARDPoint of Monitoring:
(A) Outlet of Sewage Treatment Plant (STP)
(B) Outlet of Cell 1
(C) Outlet of Cell 2
Sampling point of monitoring


Parameter Standard A (mg/l)
Biochemical Oxygen Demand, BOD5 20
Chemical Oxygen Demand, COD 120
Suspended Solids, SS 50
Nitrate Nitrogen
20
Phosphorus, P 5

 

OPERATION DETAILS
Operator Padawan Municipal Council (PMC)
Commencement 1 September 2010

CONSTRUCTED WETLAND DETAILS
     
 
Cell 1   Cell 2
     
 
Cell 1   Cell 2

EFFLUENT STANDARD MONITORING(See Details)